About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

Indonesian Petroleum Association

Abstract


22nd Annual Convention Proceedings (Volume 2), 1993
Pages 35-49

SCC Failure of 20" Condensate Pipeline

V. A. W. Semerad, H. Sutanto

Abstract

A rupture occurred on November 27, 1992 in the condensate pipeline in the Arun Field. Metallographic investigation concluded that the brittle fracture of the pipe was caused by environment-Previous HitinducedTop cracking (termed Stress Corrosion Cracking - SCC).

The SCC failure was the result of combined and synergistic interaction of mechanical stresses and corrosion. Stress concentration at corrosion generated flaws (corrosion pits) was such, that a critical value of stress concentration was exceeded, resulting in crack propagation. The interaction between the mechanical stress and corrosion was simultaneous and time dependant.

The SCC in the pipeline would not have happened if one of the factors was absent or if they functioned independently.


Pay-Per-View Purchase Options

The article is available through a document delivery service. Explain these Purchase Options.

Watermarked PDF Document: $14
Open PDF Document: $24