About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

Indonesian Petroleum Association

Abstract


24th Annual Convention Proceedings (Volume 2), 1995
Pages 285-298

Previous HitProductionNext Hit Previous HitLoggingNext Hit Below Submersible Pumps: A New and Reliable Approach

F. X. Budianto Renyut, Erdian Setiadi, Rob North

Abstract

Wireline Previous HitproductionNext Hit Previous HitloggingNext Hit provides a tool to measure reservoir performance downhole. This is a particularly valuable tool in multiple zone completions as each interval's contribution to the total well performance can be measured. This information is especially valuable in mature producing areas where reservoir pressure declines have not been distributed evenly from zone to zone. The use of electrical submersible pump (ESP) as a lift mechanism presents specific challenges to the application of Previous HitproductionNext Hit Previous HitloggingNext Hit tools (PLT) into these wellbores. The difficulty increases when there is insufficient clearance between the ESP and the casing for the Previous HitloggingNext Hit tools to pass, such as in the case of wells completed with 7 inch (18 cm) casing. This situation is encountered in a large majority of ESP lifted wells in Central Sumatra. Existing solutions to this challenge have proved to suffer from reliability and cost constraints.

A multi-disciplinary team was formed to focus on this problem, analyze the existing methods, and develop possible alternative solutions. Three existing techniques were identified and two new methods were developed by the team. Safety, reliability, practicality, and cost factors were reviewed for each. A simple technique allowing the Previous HitloggingNext Hit tools and cable to be run in the hole ahead of the ESP was determined to show the most promise and tested in an observation well. This resulted in some minor improvements and a field trial was initiated.

The new method has now been used successfully in 7 wells without a failure. The information gained has helped to allocate oil Previous HitproductionNext Hit in multiple zone completions, evaluate Previous HitproductionNext Hit potentials, and increase oil Previous HitproductionTop.


Pay-Per-View Purchase Options

The article is available through a document delivery service. Explain these Purchase Options.

Watermarked PDF Document: $14
Open PDF Document: $24