About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

AAPG Bulletin

Abstract


Volume: 49 (1965)

Issue: 1. (January)

First Page: 113

Last Page: 113

Title: Utilization of Geologic Previous HitDataNext Hit in Planning Seismic Program: ABSTRACT

Author(s): Burl A. Tuller

Article Type: Meeting abstract

Abstract:

The pertinent aspects of seismic program planning are developed within the framework of the following three-phase outline.

I. Geologic Pre-Seismic Prospect Analysis.
II. Geophysical Pre-Seismic Prospect Analysis.
III. Management--Geological--Geophysical Pre-Seismic--Prospect Analysis.

Phase I considers the available Previous HitdataNext Hit which the geologist must assemble into a logical geological picture before a possible exploration prospect is feasible. The importance of these geologic Previous HitdataNext Hit to proper seismic planning is stressed.

Phase II discusses the Previous HitbasicNext Hit problems which the geophysicist must consider in developing realistic estimates for proper utilization of the seismic tool. One should consider the type of seismic Previous HitprocessingNext Hit, expected resolution, type of equipment, and time and cost estimates.

Phase III considers the interrelated functions of geology, geophysics, and management in the final phase of seismic program planning. For example, one must consider the probable benefit of the seismic tool with regard to its fulfillment of the geologic objectives. Other items which must be clarified are the type of seismic control patterns as well as the cost and time factors involved in Previous HitprocessingTop the prospect.

End_of_Article - Last_Page 113------------

Copyright 1997 American Association of Petroleum Geologists