About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

GCAGS Transactions

Abstract


Gulf Coast Association of Geological Societies Transactions
Vol. 34 (1984), Pages 471-471

Abstract: Contour Previous HitMappingNext Hit Previous HitUsingNext Hit a Microcomputer--Techniques for Improving Throughput

Mark A. Herkommer (1)

ABSTRACT

There are three basic steps to contouring by microcomputer: control point data analysis, generating a regular Previous HitgridNext Hit of estimated values, and contouring. Because each of these steps require a significant amount of time and computer resource, techniques have been developed to improve the likelihood of correct gridding parameter selection, speed gridding, and edit computer generated countour maps.

Previous HitGridNext Hit cell size is a critical parameter used during the gridding stage of computer Previous HitmappingNext Hit and must be selected with consideration given to the control point distribution. A control points-per-Previous HitgridNext Hit cell histogram is a simple graphical presentation that illustrates the effectiveness of the selected Previous HitgridNext Hit increment at producing the desirable Previous HitgridNext Hit characteristic of having one control point per Previous HitgridNext Hit cell before gridding is actually performed.

Gridding is accomplished in two steps at every node: gathering the control points to be used for the estimation, and the actual calculation. Previous HitUsingNext Hit such simple collection and estimation techniques as nearest-neighbor searches and inverse-distance moving weighted averaging, several hundred nodes can be calculated in a few minutes.

Often, the generated Previous HitgridNext Hit (contour map) is satisfactory with exceptions in one or two subareas. Previous HitUsingNext Hit an interactive computer technique known as contour editing, geological knowledge and experience can be infused into the map. When contour editing, the computer mapper indicates the way he would like the contours to behave. The values input immediately replace the old Previous HitgridNext Hit nodes (without regridding the whole map area) so that when the Previous HitgridTop is recontoured, the new contours have the desired behavior.

Poster session presentation

End_of_Record - Last_Page 471-------

ACKNOWLEDGMENTS AND ASSOCIATED FOOTNOTES

(1) SOHIO Petroleum Co./Mid-Continent Division, Two Lincoln Center, 5420 LBJ Freeway, Suite 900, Dallas, Texas 75240

Copyright © 1999 by The Gulf Coast Association of Geological Societies