About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

Indonesian Petroleum Association

Abstract


17th Annual Convention Proceedings (Volume 2), 1988
Pages 221-228

Conceptual Design to Select the Crude Oil Scheme in Kurau Field

K. Sambodo

Abstract

Hudbay Oil (Malacca Strait) Ltd. (HOMSL) announced in August 1987 that it had applied to Pertamina-BKKA to develop the Kurau field. The Kurau Field was discovered in April 1986 when HOMSL drilled MSBG-1 to test the BG/AC structures. The field was successfully delineated with MSBG-2 drilled 1.7 km North of MSBG-1, and MSAC-1 drilled 5.75 km East of MSBG-1. Sixteen development wells are planned for the Kurau field, and production will be exported through the existing Melibur pipeline to storage facilities already installed to service production from the Lalang, Mengkapan and Melibur Fields. The Kurau field should be capable of a peak production rate of 60,000 BPD crude in 1989. HOMSL selected one oil Process scheme based on the results of the "PROCESS" and the "PIPEPHASE" computer simulation programs. This paper describes the numerous processing options considered for the development of the Kurau Field, and major details of the selected scheme.


Pay-Per-View Purchase Options

The article is available through a document delivery service. Explain these Purchase Options.

Watermarked PDF Document: $14
Open PDF Document: $24