About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

Indonesian Petroleum Association

Abstract


21st Annual Convention Proceedings (Volume 2), 1992
Pages 431-445

The Use of Production Logging Surveys to Determine the Injection Profile at the Kenali Asam Waterflood Pilot Project

Victory S. Kirana

Abstract

This paper discusses the use of Production Logging to determine the injection profile in the Kenali Asam Waterflood Pilot Project water injection wells. The results of surveys at three of four water injectors showed that the injection profile at the injection zones was not uniform due to reservoir rock characteristics, plugging of the perforated interval or poor cement bond.

Production Logging Interpretations for this paper will be limited to the evaluation of water entry to the injection zone.


Pay-Per-View Purchase Options

The article is available through a document delivery service. Explain these Purchase Options.

Watermarked PDF Document: $14
Open PDF Document: $24