About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

Indonesian Petroleum Association

Abstract


29th Annual Convention Proceedings (Volume 1), 2003
Pages 1-7

Prospects to Reservoir Models: Streamline the Workflow

Dylan Mair, Christi Gell, Noel Lucas

Abstract

Next generation 3D interpretation and reservoir Previous HitmodelingNext Hit workflows provide order of magnitude gains for prospecting and development planning. New interpretation and Previous HitmodelingNext Hit workflows take advantage of new methodologies and underlying technologies to use all available data instead of mimicking workflows that were designed around the limitations of earlier software and hardware, or were even derived from paper sections. Rapid identification and characterization of Previous HitseismicNext Hit anomalies enhances prospects identification and enables multiple realizations of each prospect model. Models are provided directly to the simulator and incorporated into an integrated asset-planning environment for portfolio risk analysis, automated well targeting and optimal field planning.

A four- to seven-fold decrease in cycle time has been proven worldwide for the Previous HitseismicNext Hit interpretation stage of a project, using this approach based on visualisation. Integrating this directly with reservoir Previous HitmodelingNext Hit the asset team can now turn Previous HitseismicNext Hit data into reservoir models in days, rather than months. This enables a streamlined interpretation to simulation workflow within every asset team, and even provides reservoir models for those assets without a dedicated Previous HitmodelingTop specialist.


Pay-Per-View Purchase Options

The article is available through a document delivery service. Explain these Purchase Options.

Watermarked PDF Document: $14
Open PDF Document: $24