29th Annual Convention Proceedings (Volume 2), 2003
Pages 1-15

Peciko Field Development – Phase 4 HP Platforms and MP Compression

Januardianto

Abstract

This paper outlines the main purpose of the new production facilities to be installed in the Peciko field during Phase 4 of the field's development.

The basic objective of this development is to be able to:

1. Maintain Peciko delivery capacity above 1250 MMSCFD

2. Maintain and Improve the export reliability:

    • Develop Medium Pressure (MP) Gas production facilities.

    • Increase the offshore gathering network flexibility

3. Support the significant increase of gas demand over 2001-2004

To meet the above objectives, the scope of the Peciko Phase 4 Project includes:

    • Addition of two new Satellite Wellhead Platform (SWP) SWP-E and SWP-K in 2003 for High Pressure (HP) production.

    • Addition of two new trunk lines between the field and the onshore facilities to provide sufficient export capacity for HP and MP production.

    • Addition of new infield sub-sea pipe-lines to provide a flexible offshore gathering network.

    • Addition of two compression trains, each with a 450 MMSCFD nominal capacity, onshore at Peciko Process Area (PPA) to lower Wellhead Flowing Pressure (WHFP) of the weakest wells.