Click to minimize content

Welcome to the new Datapages Archives

Datapages has redesigned the Archives with new features. You can search from the home page or browse content from over 40 publishers and societies. Non-subscribers may now view abstracts on all items before purchasing full text. Please continue to send us your feedback at emailaddress.

AAPG Members: Your membership includes full access to the online archive of the AAPG Bulletin. Please login at Members Only. Access to full text from other collections requires a subscription or pay-per-view document purchase.

Click to maximize content

Welcome to the new Datapages Archives

Search Results   > New Search > Revise Search

The AAPG/Datapages Combined Publications Database

Showing 19,185 Results. Searched 196,194 documents.

< Previous   6   7   8   9   10   Next >

Ascending

Novel Integrated Hole Cleaning Concept Reduces Well Construction Time By 3 Rig Days

Norbert Heitmann, Euro Chacin, Rafael Molero, Willy Graterol, Yazid Ouali, Elias Chamat Burgos, Agustin Cisneros

Indonesian Petroleum Association

... Drilling Project, in the Orinoco Belt, saved 3 rig days and reduced stuck-pipe and avoided damage to the MWD/LWD Bottom Hole Assembly (BHA) and drill bit...

2014

Extended Abstract: Maximizing Hydraulic Fracture Stimulation Using 3D Seismic Geomechanics

Michael Shoemaker

GCAGS Transactions

... of hydrocarbons. Intrinsic stress heterogeneity can now be measured in 3D space at the well pad, ahead of the drill bit. The cutting-edge technology provides...

2020

EXTENDED ABSTRACT: "Gotcha Deep" Project: Complex Formation Evaluation Using LWD and Electric Line to Increase Efficiency and Reduce Risk

John Johns, Paul A. Babasick

GCAGS Transactions

... Tay semi-submersible rig (Fig. 2) in approximately 7500 ft of water depth (AC 856 – #1, #2 and # 2 BP1). The drilling program faced several challenges...

2007

Warro Edges Closer

PESA Staff

Petroleum Exploration Society of Australia (PESA)

... to be seen, along announced on 8 March it had secured a rig for its confirmed that the field holds large volumes with how quickly the Gorgon...

2012

Bennett’s Oil Field (Bennett’s Seep) (Oil), T. 40 S., R. 10 E., SLPM, Kane County, Utah

Elliott A. Riggs

Four Corners Geological Society

... that a rig was on location with a few feet of hole having been drilled. The drill-site was a little above the petroliferous beds in the Moenkopi...

1978

Abstract: AWE to drill in New Zealand

PESA Staff

Petroleum Exploration Society of Australia (PESA)

...Abstract: AWE to drill in New Zealand PESA Staff company news AWE to drill in New Zealand WE stated on 29 January that the PMP 38158 (Tui) JV has...

2013

EVALUATION OF BOREHOLE SAMPLING METHODS APPLICABLE TO LIGNITE RESOURCE EXPLORATION

J.A. Irvine, S.H. Whitaker, P.L. Broughton, and T.E. Tibbets

Saskatchewan Geological Society

.... Dual wall drill pipe with tungsten carbide insert bit. Two types of reverse circulation rigs were employed. One rig used a kelly bar and table drive...

1974

Alkenes Detection From Drill Bit Metamorphism and Real-Time Geochemical Elemental Analysis on Drill Cuttings Aids Drilling Optimization and Geo-steering in Tight Unconventional Laterals

Ettore Carcione, Isaac Easow, Barzin Chiniwala

Unconventional Resources Technology Conference (URTEC)

... rig time to significantly reduce invisible NPT. Introduction Although the drilling efficiency and drill bit performances have been significantly...

2017

Resilience of the US Shale Production to the Collapse of Oil & Gas Prices

Philippe A. Charlez, Pierre Delfiner

Unconventional Resources Technology Conference (URTEC)

.... It is estimated that between 2014 and 2015, the investments in shale have been reduced by 40%. 9 $/MBTU $/bbl 120 2 000 Rig count Source : Baker...

2016

Abstract: Santos Reports Good Drop at Barossa

PESA Staff

Petroleum Exploration Society of Australia (PESA)

... region," Santos M anaging D i rector, j ohn Ellice- Fi int, said. " The forwa rd programme is to drill an appraisal w e ll on the nearby Cald ita gas...

2006

MSN-4 Interim Production System, Melibur Field, Malacca Strait

S. P. Santoso

Indonesian Petroleum Association

... scheme on the MSN-4 appraisal well. Using a Jack- up drilling rig and a shuttle tanker. MSN-4 is located in the Selatan oil field 26 Km South-East...

1990

Integrated Tubulars Supply Model Provides Cost Savings to Drilling Projects

Muhammad Hamzah, Chandu Revanur, Ilham Trijayanto

Indonesian Petroleum Association

... the release of the pipes from the manufacturing facility to the rig floor. Health, Safety, and Environmental (HSE) risks associated to pipe movements on the rig...

2020

ABSTRACT: DEEP DRILLING THE ORISKANY IN CENTRAL PENNSYLVANIA

Carl Heinrich

Petroleum History Institute

... area. The early rotary drilled wells were first drilled to 1500-2000 feet using a cable tool rig (usually a Bucyrus-Erie 48-L spudder) to drill the very...

2013

The Combination of Well Engineering, Well Integrity, and Managed Pressure Drilling to Assist and Support Indonesia's Drilling and Completion Operations

Donny H. Gultom, Fikri Irawan, Ardia Karnugroho, Chad Wuest

Indonesian Petroleum Association

... cable tool rig to drill the first economically viable oil well in the western hemisphere. Wells drilled with cable tool rigs, including those drilled...

2015

Cost Study for Offshore Exploratory Drilling Operation

Saifullah, Septoratno Siregar, Pudjihanto Suwarno

Indonesian Petroleum Association

... as functions of total depth from rig floor are combined with data gathered from onshore operations. Variable Identification Costs of offshore...

1996

The Diamond Drill in Oil Exploration

Robert Davis Longyear

AAPG Bulletin

...The Diamond Drill in Oil Exploration Robert Davis Longyear 1922 98 111 6 2. (March-April) The recent success of the Panuco-Boston Oil Co. in bringing...

1922

Ballard Pictured Cliffs (Gas), Otero Pictured Cliffs (Gas), T. 22-27 N., R. 2-9 W., NMPM Sandoval, San Juan, and Rio Arriba Counties, New Mexico

C. F. Brown, Jay J. Harris

Four Corners Geological Society

... feet. Drill to top of Pictured Cliffs Sandstone and set casing. Rig up cable tool rig and drill through Pictured Cliffs section. Pack open hole...

1978

Mechanical Control of Annular Gas Flow, a Case Study and Way Forward Analysis

Guillaume Tarnaud, Philippe Essel, Jack Newberry, Franck Wendlinger, C.O. “Doc” Stokley

Indonesian Petroleum Association

... can be minor such as SCP or severe to the extent of rig evacuation and fire. The Gulf of Mexico is known to have over 8,000 wells with SCP1,2...

2007

Let’s Stop Kidding Ourselves1

Eldon House

Earth Science Bulletin (WGA)

... a geologist has is the drill cuttings under his microscope, at least until drilling is completed and the hole is logged. Even then, it is extremely helpful...

1970

Logging Wells Drilled by the Rotary Method

Edgar Kraus

AAPG Bulletin

... correctly to within 2 or 3 feet if ordinary care is exercised. The method used by drillers is to keep a record of the drill stem in this fashion: The Kelly...

1924

Deep Drilling Practices — Wind River Basin of Wyoming

Bradley D. Bilyeu

Wyoming Geological Association

... conditions, rig repairs, drill stem testing, and possibly to being drilled slightly over balanced (Fig. 9). Drilling rates from 12,500 feet to 14,635 feet...

1978

The US Natural Gas Revolution: Technology Transforms A Market; #70101 (2011)

Porter Bennett

Search and Discovery.com

... Yr Average 30 Day Ave. Init Prod Drill & (Days) Per Rig Lateral Length Prod Rate Additions Complete (Feet) (Mcf/d) Per Rig Per Yr Costs ($MM) (Mcf/d...

2011

Demonstrating Capability

Trond Gravem

GEO ExPro Magazine

... to the drill bit as feasible. 24 GEO ExPro November 2006 Engineers from Baker Hughes INTEQ on the rig floor following the MWD/LWD tools being run down...

2006

< Previous   6   7   8   9   10   Next >