About This Item

Share This Item

The AAPG/Datapages Combined Publications Database

Southeast Asia Petroleum Exploration Society (SEAPEX)

Abstract


Proceedings of the 2013 South East Asia Petroleum Exploration Society (SEAPEX) Conference, 2013
Pages 1-8

Songkhla D and E, Exploration & Development

Ronald The, John Pringle, Keith Brazier, Geoff Peace, Andy Laird, Rapee Kudisri

Abstract

A total of 8 wells were initially drilled on the Songkhla E location. A Mobile Production Unit and a Hydraulic Workover Rig completed the wells with down hole pumps. 3 out of 5 exploration targets hit commercial levels, development was fast tracked, the first oil was hit 3 months after discovery, and low development CAPEX reduced the risk.

Keywords: A total of 8 wells were initially drilled on the Songkhla E location. A Mobile Production Unit and a Hydraulic Workover Rig completed the wells with down hole pumps. 3 out of 5 exploration targets hit commercial levels • development was fast tracked • the

Presented at: 2013 South East Asia Petroleum Exploration Society (SEAPEX) Conference, Singapore, 2013


Pay-Per-View Purchase Options

The article is available through a document delivery service. Explain these Purchase Options.

Watermarked PDF Document: $14
Open PDF Document: $24