Abstract


15th Annual Convention Proceedings (Volume 2), 1986
Pages 227-241

An Overview of the Performance of Gas Lift Operations in the Ardjuna Fields, Java Sea

J. A. Davidson, C. M. Victors

Abstract

The Ardjuna Field is a complex of producing structures located offshore Northwest Java. Twenty eight separate fields have been developed to date. Each of these geologic structures is characterized by multiple producing horizons of dissimilar reservoir properties and production mechanisms. Due to the numerous pay zones, the majority of the development wells were equipped with dual tubing strings, multiple packers and sliding sleeve assemblies.

During development, Atlantic Richfield Indonesia Inc. (ARII), made an early commitment to artificial lift and gas lift mandrels were installed in most wells during initial completion. Lift gas has been supplied either from field compressor plants or from the natural energy of gas reservoirs. Artificial lift has become a vital part of ARII's operation in the Ardjuna Field with 157 of 301 wells currently under gas lift. Gas lift accounts for 43% of current production.

This paper provides an overview of our gas lift operations. Emphasis is placed on past performance and techniques used to overcome problems that have been encountered in design and operation of our gas lift systems.