Horizontal Recompletion With Short Radius Technique in Handil Field (Total Mahakam Contract Area) East Kalimantan — Indonesia
Abstract
Total Indonesie utilized short radius horizontal technique to recomplete an existing well in order to increase the productivity.
Two phases have been done i.e :
1. Preparation (POOH dual strings and five packers, squeeze-off perforations and perform window mill).
2. Horizontal drain.
An articulated positive displacement motor with MWD and steering tool were used to drill a lateral drain hole through a 4 meters thick sandstone reservoir at 2131 meter TVD.
The possible advantages of short radius horizontal technique are :
• Eliminate / decrease coning problem.
• Increase productivity.
• Vertical hole closer to pay zone which facilitates pumping particularly for low energy reservoirs.
• Cheapest way to evaluate an area for horizontal drilling.
This paper will describe the technical and economical reasons of using short radius as a recompletion method, techniques for horizontal re-entries will be discussed along with project planning considerations
, well design, choice of tools, completion consideration and postwell analysis to further develop the application of short radius system as recompletion method.